Electrical Panel Upgrade Nationwide
100A → 200A or 400A — sized for EV, solar, and modern loads.
Electrical panel upgrades in the U.S. — 100A to 200A or 400A service, new main breaker, meter base, and grounding to current NEC. Required for EV chargers, solar interconnect, hot tubs, and high-amp HVAC.
Panel Upgrade pros serving the U.S.
Licensed electricians who pull the permit and coordinate the utility cut-in.
More panel & service work
Panel Upgrade FAQ
+How much does an electrical panel upgrade cost in your area?
A standard 100A → 200A upgrade in your area typically runs $2,500–$4,500 including permit, utility coordination, and new main breaker. 400A and underground services run $6,000–$15,000+.
+How long does a electrical panel upgrade take in your area?
Most your area panel jobs are completed in 6–10 hours on-site with a 4–8 hour utility power cut. Permit and inspection scheduling typically adds 1–2 weeks of lead time.
+Do I need a permit for panel work in your area?
Yes — service changes, meter swaps, and main breaker upgrades require a permit in virtually every your area jurisdiction. Your licensed electrician pulls the permit and coordinates with the AHJ and utility.
+Will the utility need to cut power for my upgrade in your area?
Yes. Your contractor schedules a meter-pull / cut-in with the local your area utility. Most upgrades land same-day power restoration; large 400A or underground services may take longer.