Office systems
Tenant fit-outs, lighting controls, and low-voltage backbones for Class-A and multi-tenant buildings.
- ›Tenant fit-outs and demising work
- ›Structured cabling — Cat6A and OM4 fiber
- ›DLM, 0-10V, and DALI lighting controls
- ›UPS + generator transfer for IDF/MDF
- ›Conference-room power, AV, and floor boxes
- ›Occupancy / daylight sensors, sub-metering
1,000 → 250,000 sq ft floor platesAfter-hours occupied-building protocolProperty-management coordination
ASHRAE 90.1 / Title 24NEC Art. 725 / 800TIA-568 / 569
Industrial projects
Plant power, motor controls, and shutdown-coordinated upgrades for manufacturing and processing facilities.
- ›480V 3-phase distribution and switchgear
- ›Motor control centers, VFDs, soft-starts
- ›PLC integration (Allen-Bradley, Siemens)
- ›Bus duct, busway, and machine wiring
- ›Arc-flash studies (NFPA 70E) and labeling
- ›Planned shutdowns with production-aware sequencing
100A → 4000A serviceUp to 35 kV medium-voltage24/7 emergency response
NEC Art. 430 / 440NFPA 70EOSHA 1910.147 LOTO
Warehouses & distribution
High-bay retrofits, dock and conveyor power, and EV fleet charging for DCs and fulfillment centers.
- ›High-bay LED retrofits with motion controls
- ›Dock-door power, levelers, and lock interlocks
- ›Conveyor, sorter, and MHE wiring
- ›Photo-eye, scanner, and PLC hookups
- ›EV fleet + yard tractor charging
- ›Fire-pump circuits and life-safety branches
50,000 → 1.5M sq ft DCsAisle-by-aisle phased workSecond-shift / weekend crews
NEC Art. 695 (fire pumps)NEC Art. 625 (EVSE)NFPA 13